top of page

Reduce the cost of repeated repairs to ZERO

100%

REDUCE WASTE

80 %

REDUCE COST OF INSTALLING INFRASTRUCTURE

100%

REDUCE COST OF REPEATED REPAIRS TO PAVEMENTS & FOOTINGS

100%

REDUCE ONGOING TRAFFIC MANAGEMENT AND SAFETY REQUIREMENTS

100 %

ZERO ONGOING CONSUMPTION OR SUPPLIES

​

It’s not rocket science - by eradicating damage, you reduce the on-going cost or repeated repairs to ZERO, saving thousands over the life of a development

​

​

"It's just so simple"  THE SUNDAY TIMES

True genius lies in the ability to make the complex simple.

​

We all know plastics won’t break down for hundreds of years. By harnessing the resilience of plastic, we can protect vulnerable Concrete Footings from damage for the next 100 years

​

 

• Proven durability: Thousands of units installed for 30+ years  are still performing like new.
 

• Zero replacements required — Ground sockets protect concrete fotings for a 100+ year lifecycle

 

•Providing ROI over 14,800%  + (reduction in variables & risks)

output.png
ROI.png

This only accounts for the savings per average replacement  but the real savings lie in the reduction of variables and risks that currently cost road authorities millions every year and often mean the difference between success or failure of a project

risk reduction.png
zero_waste_developments.png

We aren't going to change the world- You are

You are building our future- The decision you make today will affect generations to come. 

​

​

With 80% of the workload resulting from the most vulnerable items (which represent around 20% of all items), cities very quickly transition to a position of sustainability

​

Save thousands on maintenance

Save thousands on new works and upgrades

Installing roadside items has never been easier - you can literally install hundreds of items in a single day.

​

Creating cleaner, safer superior developments.

“ Our selection is not based on price alone, we also took into consideration the safety and saving aspects. ZERO WASTE Unbreakable Foundations allow quick replacement of items with no further effort required to the base, (providing a significant cost benefit in replacing the damaged item by re-using the existing footing) and reduces risk of injury to employees by reducing time spent on traffic islands exposed to traffic.” 

​

MAIN ROADS DEPT W.A.

​

ZERO CIVIL
hello @ zerocivil.com

0414 628 511

​

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Beringarrah Drive Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

​

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

​

ACN: 149 854 080

ABN: 54 149 854 080

​

smart AI infrastructure
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page