top of page

REDUCE COSTS BY AROUND 80% WITHIN 2-3 YEARS

" the solution is so simple!"
The Sunday Times

100%

REDUCE WASTE

80 %

REDUCE COST OF INSTALLING INFRASTRUCTURE

100%

REDUCE COST OF REPEATED REPAIRS TO PAVEMENTS & FOOTINGS

100%

REDUCE ONGOING TRAFFIC MANAGEMENT AND SAFETY REQUIREMENTS

100 %

ZERO ONGOING CONSUMPTION OR SUPPLIES

100%

Reduce damage and carbon waste to ZERO for the next 100 years. 

​

100 %

No replacing valuable footings. Replace damaged items in seconds- no heavy labour for 100 years

​

100%

No costly repairs, or risk of cost overruns for 100 years

​

100%

No body stressing; no hitting dangerous underground services or risk of silicosis​

​

It’s not rocket science - by eradicating damage, you reduce the on-going cost and associated risks to ZERO, saving thousands over the life of a development

​

​

"It's just so simple"  THE SUNDAY TIMES

True genius lies in the ability to make the complex simple.

​

​

​

With 80% of the workload resulting from the most vulnerable items (which represent around 20% of all items), cities very quickly transition to a position of sustainability

​

Save thousands on maintenance

Save thousands on new works and upgrades

Installing roadside items has never been easier - you can literally install hundreds of items in a single day.

​

Creating cleaner, safer superior developments.

“ Our selection is not based on price alone, we also took into consideration the safety and saving aspects. ZERO WASTE Unbreakable Foundations allow quick replacement of items with no further effort required to the base, (providing a significant cost benefit in replacing the damaged item by re-using the existing footing) and reduces risk of injury to employees by reducing time spent on traffic islands exposed to traffic.” 

​

MAIN ROADS DEPT W.A.

​

ZERO CIVIL
hello @ zerocivil.com

0414 628 511

​

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Beringarrah Drive Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

​

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

​

ACN: 149 854 080

ABN: 54 149 854 080

​

zero waste heroes
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page