top of page

improve safety & efficiency

of installing roadside infrastructure

ICON WASTE.png

Superior finish

Newly laid pavements and footings remain undisturbed

Reduce risks

Items are installed without disturbance

Reduce costs

Reduce the cost of installing roadside items and the risk of cost overruns

More resilient developments

Footings and infrastructure remain in pristine condtion for decades

Installing ground sockets

Ground sockets can be installed when pouring footings (preserving the integrity of the valuable foundations and paving) creating a perfect finish and greatly reducing both costs and risks.

install_items_concrete.gif

Instead of spending hours digging up newly laid foundations, damaging the integrity day 1

self-locking.gif

Installing items

You simply attach the Taper, drop items into the ground socket and they "automatically" lock in using friction, only removable using tools provided.

No costly delays - you can install the infrastructure for an entire development in a single day.

 

Because they are secured using friction they remain perfectly aligned, safe and secure year after year.

zero waste civil supplies
zero waste carpark supplies
Public Transport supplier
zero waste
main roads
zero waste civil supplies
bollards
mrwa
zero waste civil supplies
zero waste foundations
westernpower
civil supplies
zero civil client
zero civil client
zero waste bollards
zero waste civil supplies
zero waste civil supplies
western power
bollards

   

It is time to build superior developments and reduce the risk of cost overruns

Foundations remain in perfect condition for decades and items remain perfectly aligned.

 

Road infrastructure, bollards and street furniture can be installed in a fraction of the time - at a fraction of the cost

Simply smarter, safer infrastructure.

 


 

Infrastructure remains perfectly aligned safe and secure year after year, and becomes easily replaceable and interchangeable.

Creating cleaner, safer more efficient developments for generations to enjoy

Instead of being in a constant state of decline, ZERO WASTE Developments remain in pristine condition and if a roadside item or item of street furniture is damaged or grows old and unsafe it can quickly be replaced, so developments remain in a safe, well maintained condition at all times, with no disturbance for maintenance or upgrades.

ZERO CIVIL
hello @ zerocivil.com

0414 628 511

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Vale St Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

ACN: 149 854 080

ABN: 54 149 854 080

smart glowing bollards
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page