top of page

superior new works

improve safety & efficiency

long-term sustainability.png

of roadside and urban infrastructure

ICON WASTE.png

Superior finish

Newly laid pavements and footings remain undisturbed

Reduce risks

Items are installed without disturbance

Reduce costs

of installing roadside items and the risk of cost overruns

More resilient developments

Footings and infrastructure remain in pristine condtion for decades

Installing ground sockets

Ground sockets can be installed when pouring footings (preserving the integrity of the valuable foundations and paving) creating a perfect finish and greatly reducing both costs and risks.

install_items_concrete.gif

Instead of spending hours digging up newly laid foundations, damaging the integrity day 1

Installing items

Simply attach the Taper and drop the item into the ground socket. It automatically locks securely into place using friction and can only be removed using our purpose-designed tools.

​

No costly delays - you can install the infrastructure for an entire development in a single day.

 

Because each item is friction-locked into position, it remains secure, stable and perfectly aligned year after year.

​

​

zero waste civil supplies
zero waste carpark supplies
Public Transport supplier
zero waste
main roads
zero waste civil supplies
bollards
mrwa
zero waste civil supplies
zero waste foundations
westernpower
civil supplies
zero civil client
zero civil client
zero waste bollards
zero waste civil supplies
zero waste civil supplies
western power
bollards

Infrastructure remains perfectly aligned safe and secure year after year, and becomes easily replaceable and interchangeable.

barrier (3).jpg

Barriers

Remain safe & secure

grab_rails.jpg

Grab-rails

Perfectly aligned

bikerack holland.jpg

Bike racks

Removable adnd relocatable

signage_hillary's.png

Parking signage

Safe & perfectly aligned

Removable_Bollard.gif

Bollards

Impact Resistant & removable

seat_europe.png

Street Furniture

Removable and relocatabe

mrwa_signage.png

Traffic signage

Replaced in seconds

bike_path_bollard.jpg

Bike Path Bollards

Safer, impact resistant

MRWA_Traffic_Bollards1_edited.png

Traffic bollards

Removable and sustainable

st georges tce bollards copy.jpg

Surface Mount Bollards

Impact Resistant

bin.jpg

Bins

Removable, relocatable

subsiaco table.png

Tables

Stable & removable

Creating cleaner, safer more efficient developments for generations to enjoy

Instead of being in a constant state of decline, ZERO WASTE Developments remain in pristine condition and if a roadside item or item of street furniture is damaged or grows old and unsafe it can quickly be replaced, so developments remain in a safe, well maintained condition at all times, with no disturbance for maintenance or upgrades.

​

ZERO CIVIL
hello @ zerocivil.com
accounts@zerocivil.com

PH: 08 6255 5610

URGENT INQURIES: 0414628511

​​​

 

SHOWROOM

115A Kalgoorlie Street, Mt Hawthorn WA

 

DISTRIBUTION
Roberts St, , Osborne Park, WA 6021
 

MANUFACTURING
Victoria Road Malaga WA 6090
Innovation Drive Wangara 6065

​

CORPORATE BODY

Advanced Civil Technologies
123 St George’s Terrace, Perth, WA 6000
info@advanced-civil.com

 

PRODUCT DEVELOPMENT

Smart Urban Pty Ltd

hello @ smarturban.com.au
 

REGISTERED OFFICE
Level 1/565 Hay St, Daglish WA 6008

​

ACN: 149 854 080

ABN: 54 149 854 080

​

  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page