why this change is urgent  

Australia's road authorities are under unprecendented pressure

Alarming Trends for road authorities

In the UK, frontline road workers are now required to undergo self-defence training, as abuse and assaults rise dramatically on public works crews.  

 

In the USA, silicosis claims are skyrocketing, with compensation reaching into the hundreds of millions annually, forcing departments to rethink traditional concrete removal practices.

National Infrastructure Burden (2024):

 

  • Over $1.2 billion lost annually due to utility strikes and reworks.
     

  • Workplace injuries in roadworks costing over $640 million per year.
     

  • Waste management costs are rising 12% annually.
     

  • Millions in fines and investigations related to poor WHS and EPA compliance.
     

Australia’s road authorities are facing a crisis

What once worked, is now dragging departments under a mountain of regulations, paperwork, public scrutiny, and avoidable expenses.

Costs are spiraling, Risks are escalating, and Compliance requirements are growing way more complex.

This work is becoming untenable. Road authorities are stuck in a continual cycle of damage, costly repairs and mounting paperwork.

 

With growing environmental disasters and rapid urbanisation, we've reached the tipping point, and we cannot "continue with business as usual" 

"Business as Usual" Is No Longer an Option

Workers in UK must now undergo salf defence courses and in the USA silicosis is already costing road authorities millions.

 

Environmental and waste regulations

Failure to comply with the UK Environment Agency’s waste tracking and disposal regulations can result in fines up to £500,000 and criminal prosecution.
 

In the USA, the EPA has increased federal fines of up to US$50,000 per day for improper disposal

  • Obligation: The EPA mandates all waste be managed under licensed transport and disposal schemes.
     

  • Reality: 100% of the concrete and paving used to secure roadside items goes to landfill
     

  • Reality: Breaking up concrete footings creates waste that requires licensed removal and tipping—costly and time-consuming.

    Cost: Landfill levies and tipping fees vary by state but are rising rapidly—up to $250/tonne in some regions.

  • Obligation: Under the Model WHS Act, authorities must ensure the health and safety of all workers.
     

  • Reality: Traditional methods put workers at risk of body stressing (The number one cause of  injury)
     

  • Reality: Traditional methods put workers at risk of injury spending hours every day working in dangerous traffic (the number one cause of serious workplace injury)
     

  • Reality: Traditional methods put workers at risk of serious or fatal injury from disturbance to (often poorly marked) dangerous underground services
     

  • Reality: Traditional concrete installations put workers at risk of silica exposure, with projections suggesting payouts will cost road authorities (esp maintenace sector) millions in the coming years

    One serious WHS breach can incur penalties of up to $3.5 million for corporations.

WHS Obligations are mounting

A sign of what's coming:

HSE Fines Surge: UK courts handed out over £35.8 million in health and safety fines in 2023 alone — a 44% increase from the previous year.

HSE random inspections now impact 1 in 5 local road projects

If changes aren’t made soon, road authorities will face growing exposure to litigation—from injured workers, environmental regulators, and auditors—each with the power to shut projects down or issue crushing penalties.

Expect more:
 

  • Blowouts

  • Injuries

  • Fines

  • Public scrutiny

  • Burnout

 

This is a warning. Not a sales pitch.

The system is failing—but there is a better way.

What’s at Stake?

Inaction at this stage could render your organisation or department operationally and financially untenable within a few short years 

  • Obligation: Councils and State Road authorities must demonstrate they’ve considered whole-of-life cost, environmental impact, and social outcomes.
     

  • Reality: Failing to procure sustainable products and implement sustainable practices can result in failed audits, public criticism, and result in spiraling costs

Best-Practice Procurement Standards

zero waste civil supplies
zero waste civil supplies
zero waste carpark supplies
Public Transport supplier
zero waste
main roads
bollards
mrwa
zero waste civil supplies
zero waste foundations
westernpower
civil supplies
zero civil client
zero civil client
zero waste bollards
zero waste civil supplies
zero waste civil supplies
western power
bollards

ZERO CIVIL
hello @ zerocivil.com

0414 628 511

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Vale St Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

ACN: 149 854 080

ABN: 54 149 854 080

smart glowing bollards
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page