top of page

buying

impact recovery bollards

long-term sustainability.png

Advanced engineering delivers superior projects and long term resilience, building sustainable long term success

STEP 1 Select your bollard design

STEP 2 : Select the foundation

zero waste bollard
zero waste bollard
zero waste bollard
zero waste

1.SELECT BOLLARD

 Select your bollard design. Steel powder coated , Stainless steel (pipe polished) or Advanced Polymer (non conductive, won't rust, dent or chip (Western Power Approved)

Standard units are Safety Yellow but can be made in other colours (min 6 )

STEEL BOLLARDS

bollards
zero waste

STAINLESS STEEL BOLLARDS

stainless steel bollards
zero waste

 ADVANCED POLYMER BOLLARDS

Poly Bollards

Best suited for Disabled Bay and carpark Bollards

STEP 2. SELECT FOOTING

Choose to install your bollard In-ground (removable) 350 mm or 650 mm Depth. 

350 mm is sufficient for most applications (as the rings take the brunt of the impact force) unless bollard may be subject to severe impact from trucks/ large vehicles (then we  suggest installing foundation to 650 mm depth)

Surface Mount must be installed in substantial concrete footing using 5 evenly spaced concrete anchors. 

350 MM IMPACT RECOVERY

impact recovery bollards
zero waste

650 MM IMPACT RECOVERY SYSTEM

Impact recovery system 650
zero waste

 SMOUNT IMPACT RECOVERY SYSTEM

impact absorbing system surface mount
zero damage

The Resistance Core is the ONLY replaceable component

We suggest buying a few spares to ensure replacements can be made quickly following any bad impact. 

350 MM IMPACT RECOVERY

650 MM IMPACT RECOVERY SYSTEM

Impact recovery system 650
zero waste

 SMOUNT IMPACT RECOVERY SYSTEM

impact absorbing system surface mount
zero damage

AVAILABLE NATIONALLY

Smart Distributors

You can order any of our products from all major distributors of traffic and civil supplies Australia wide. If you have a preferred supplier not on our list- please don't hesitate to contact us on 08 9248 5545 to add them to our suppliers  list or email hello@zerocivil.com

zero waste bollard supplier
zero waste bollard supplier
zero waste bollard supplier
zero waste bollard supplier
zero waste bollard supplier
zero civil

ZERO CIVIL
hello @ zerocivil.com

0414 628 511

Our phone is temporarily disabled- please use mobile to contact us in the meantime. 

 

Warehouse and Distribution Centre 1:  
19 Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2:
Vale St Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

ACN: 149 854 080

ABN: 54 149 854 080

  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page