top of page

Sick of Bloody Bollards?

​When a rigid bollard is impacted - something's gotta give, so you need to replace the bollard and the footing impact after impact!

 

We have a simple solution that protects people assets and makes both the bollard and valuable footings reusable impact after impact 

stop_damage.jpg

Anyone who works with bollards and hasn't referred to them as  "Bloody Bollards", is a saint! 

Search

Western Power Non-conductive Bollards

Writer's picture: ZERO CIVILZERO CIVIL

Updated: Jan 20

NOTES:


1. ENTIRE INSTALLATION IS RATED FOR LOCAL SOIL & WIND CONDITIONS.


2. SUPPLY AND INSTALL NON-CONDUCTIVE BOLLARDS IN LOCATIONS AS REQUIRED TO PROTECT URD AND SMSB TO SUPERINTENDENTS’ APPROVAL.


3. UNDERTAKE SITE INVESTIGATIONS TO DETERMINE EXACT LOCATION OF ALL EXISTING UNDERGROUND CABLING IN VICINITY. IF PROPOSED LOCATIONS OF BOLLARDS IS COMPROMISED BY EXISTING UNDERGROUND ASSETS, REPORT TO SUPERINTENDENT FOR DIRECTION.


4. PROVIDE SURVEY WITH PROPOSED FINAL LOCATION OF BOLLARDS TO SUPERINTENDENT FOR APPROVAL PRIOR TO COMMENCING ANY POTHOLES AND/OR PLACING ORDERS FOR BOLLARDS


5. NON-METALLIC BOLLARDS SHALL BE CIRCULAR 150 mm X 1250 mm TALL, ROUND TOP. ZERO CIVIL, B150, ZERO CIVIL, B150, + IRR-150 OR APPROVED EQUIVALENT.


6. BOLLARDS SHALL BE YELLOW WITH RED/WHITE REFLECTIVE BAND


7. BOLLARDS ARE MANUFACTURED BY AUSTRALIAN COMPANY THAT SUPPLIES NON-METALLIC BOLLARDS FOR PROTECTION OF ELECTRICAL ASSETS. USE SPECIFIED FITTINGS OR APPROVED EQUIVALENT e.g. SMART UBRAN PTY LTD / ZERO CIVIL - CONTACT LISA KASTEN (0414 628 511)


8. INSTALL BOLLARDS TO MANUFACTURES RECOMMENDATION, TO SUPERINTENDENTS’ APPROVAL.


9. PROVIDE CONCRETE FOOTING MINIMUM 400mm DEEP AND 400mm SQUARE, FOR SOLID CONCRETE FOOTINGS AND 700 X 400 mm FOR FREE STANDING INSTALLATIONS, BELLED OUT AT BASE WHEN IN NON- COMPACTED SOIL.


10. CONCRETE BASE SHALL BE 30MPa OR GREATER, DO NOT USE RAPID SET AS IT IS NOT IMPACT RESISTANT. 


11. DO NOT USE FLEXIBLE GROUT.


12. TAPER MUST FINISH FLUSH WITH SOCKET, AND SOCKET MUST FINISH FLUSH WITH GROUND LEVEL SO THEY ARE NOT DAMAGED ON IMPACT.


13. COLOUR OF FOUNDATION TO MATCH WALKWAYS - CONFIRM FINISH WITH SUPERINTENDENT PRIOR TO POURING FOUNDATION.


14. PROVIDE SHOP DRAWING TO SUPERINTENDENT FOR APPROVAL. 


15. WE RECOMMEND A MAXIMUM OF 1.5 M SPACING OF BOLLARDS







3 views0 comments

Recent Posts

See All

Comments


​

ZERO CIVIL
hello @ zerocivil.com

​

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Beringarrah Drive Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

​

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

​

ACN: 149 854 080

ABN: 54 149 854 080

​

zero waste heroes
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page