Improve the safety and efficiency of infrastructure maintenance

SCROLL DOWN

With rapid urbanisation, maintenance requirements are expected to increase dramatically in the coming years but funding is likely to not increase- how will you cope with the growing workloads, risks and costs?

Using current methods the damage and maintenance requirements are expected to increase dramatically in the coming years, as will the difficulty performing maintenance 

 

Predictions are that the government has massively underestimated the future cost of maintenance so funding is unlikely to increase- how will you cope with the growing workloads, risks and costs?

old methods.gif

Creating cleaner, safer more efficient developments is easy 

Instead of being in a constant state of decline, ZERO WASTE Developments remain in pristine condition and if a roadside item or item of street furniture is damaged or grows old and unsafe it can quickly be replaced, so developments remain in a safe, well maintained condition at all times, with no disturbance for maintenance or upgrades.

impact_zero_waste.gif

MAKE ITEMS AND FOOTING
IMPACT RESISTANT

Time to clean up your city

​​

  • Make foundations reusable following impact

  • Make posts reusable following impact.

  • Make posts & bollards self recover from impact

  • Make bollards reusable following severe impact.

  • Make barriers safe and secure for events

  • Make barriers and signage removable & relocatable for events & fast disaster response

  • Make street furniture removable and relocatable

​

When impacted posts and bollards self recover. If badly impacted the footing remains undisturbed and items remain safe, secure, perfectly aligned for generations

REMOVING ITEMS

Using the ergonomic removal tool you use a jerking action to beak the seal and lift the damaged item from the ground socket.Taper can be removed and re-used multiple times.

​

A tool is also available for flattened posts and sheared off posts.

​

There is no instance an item cannot be removed using the tools provided. The unit will continue working effectively for decades.

​

​

removing posts.gif
self-locking.gif

INSTALLING ITEMS

You simply attach the Taper, drop items into the ground socket and they "automatically" lock in using friction, only removable using tools provided.

​

No costly delays - you can install the infrastructure for an entire development in a single day.

 

Because they are secured using friction they remain perfectly aligned, safe and secure year after year.

​

​

Cities quickly become financially sustainable and you continue saving for the next 100 years 

​

 

80% of the workload results from the most vulnerable items (which represent around 20% of all items). These are first to be damaged (and repaired) and once repaired, there are zero repair costs for a massive 80% of your workload.

​

​

INSTALLING GROUND SOCKET

When an item is damaged instead of installing it directly in concrete, ground sockets can be installed when pouring concrete footings (preserving the integrity of the valuable foundations) creating a perfect finish and greatly reducing both costs and risks.

install_items_concrete.gif
nistall socket island.gif

OR USE INSTALLATION TOOL

If items are heavy, in windy or rainy conditions or you don't have time to wait for concrete to cure you can use the Installation tool to simply position the socket upright, (from a standing position) check alignment, and pour the concrete footings to secure the socket. 

Install the infrastructure for an entire development on unbreakable foundations

Anything from signposts, grab-rails, barriers, bollards (any diameter), even an outdoor table, rubbish bin, bike rack or seating can be installed using ZERO WASTE Foundations. All items become relocatable and interchangeable greatly improving the safety and efficiency of events, maintenance and upgrades.

​

ZERO CIVIL
hello @ zerocivil.com

​

Warehouse and Distribution Centre 1:  
Gibberd Road Balcatta WA 6021

Warehouse and Distribution Centre 2: Beringarrah Drive Malaga WA 6090
 

Manufacturing  Warehouse 1:
Victoria Road Malaga WA 6090
 

Manufacturing  Warehouse 2:
Innovation Drive Wangara 6065

​

SMART URBAN PTY LTD

hello @ smarturban.com.au


Management: 123 St George’s Terrace, Perth, WA 6000
 

Registered Office: Level 1/565 Hay St, Daglish WA 6008

​

ACN: 149 854 080

ABN: 54 149 854 080

​

zero waste heroes
  • LinkedIn
  • Facebook
  • Twitter
  • Instagram
bottom of page