SPECIFICATIONS
IMPACT ABSORBING BOLLARDS
IMPACT TESTED FOR YOUR PEACE OF MIND
UPON LOW IMPACT
The bollard will bring a passenger vehicle to a stop
UPON SEVERE IMPACT
​
The bollard will bring a passenger vehicle to a stop. Bollards deflect and require replacing
Designed to protect people & assetts
Impact tested in accordance with AS/NZS 3845.2:2017 classified as a ‘road safety device’.
​
Meets Australian Crash Barrier Standard AS/NZS 3845:1999 (60 km/h).
​
Bollards demonstrated they were capable of preventing an errant pedestrian vehicle from entering an area. The impact absorbing cartridge crushed and the bollard required replacing.
​
VIEW VIDEO OF ENERGY ABSORBING BOLLARD
ENERGY ABSORBING BOLLARDS
The Energy Absorbing Bollard (EAB) is designed to a TL-0 containment level, meaning it is capable of halting vehicles weighing 1600kg while travelling speeds of up to 60 kmhr
​
-
EAB has been crash tested in accordance with AS3845.2 demonstrating they can contain a 1600kg vehicle at 51.9km/h with an Impact Energy of 166.3kJ
-
Another test conducted with a Concrete slab at the surface showed they can contain a 1,615kg vehicle at 62.5km/h with an Impact Energy of 243.4kJ, test no. 21062-02.
​
​
Bollards are one metre high (installed in-ground using a Reo cage and concrete footing) available in a galvanised steel and powder coated finish.
The EAB is designed to a TL-0 containment level, meaning it is capable of halting vehicles weighing 1600kg while travelling speeds of up to 60 kilometers an hour.
The EAB Cartridge is filled with VVH Grade Polystyrene foam which increases its shock absorbing capabilities, making it compliant with AS/NZS 1698:2006
​
​​
​
MAINTENANCE
When impacted the bollard and surrounding foundations will show signs of damage and the impact absorbing cartridge will need replacing.
(Damage to the cartridge will result in the above-the-ground bollard not being straight.)
​
​
-
The bollard is removed from the cartridge.
-
The concrete footing needs to be broken using a jack hammer and crowbar.
-
The damaged concrete footing must be removed and disposed of
-
A new footing, a new cartridge, and reinforcing reo cage must be installed and filled with 30-40MPa concrete to repair the damaged footing.